Investigative insert, Portland, re Columbia River dredging (file copy, page one)

This copy: Part 65 p. 150Also filed at Part 43 p. 376 (primary) · Part 69 p. 186 · Part 70 p. 185

This copy’s own title

Insert, Portland: Army Engineer District interview re Columbia River dredging

Document date 13 February 1980

Part 65page 1501 pageDB Cooper-27401

Another copy of this document is the primary, most legible copy: Part 43 p. 376.

Copies may differ in what was redacted.

Part of: Investigative insert, Portland, re Columbia River dredging near Willow Bar and money find site · 13 February 1980 · Part 43 pp. 374–375

Open in FBI Vault (Part 65, page 150 of the PDF)
Report a problem

Email this to [email protected]

Id: Cooper-Part-65:150-150

Subject: Cooper Files: Cooper-Part-65:150-150

Document: Report insert, Portland: Army Engineer District interview re Columbia River dredging
Id: Cooper-Part-65:150-150
Page: https://cooper.theunsolved.net/documents/Cooper-Part-65%3A150-150

What is wrong (title, date, type, which pages belong together, copies)?


What does the scan show?

Open in email app

A person reads every report. Corrections are made by hand, to the data — titles, dates, names, which pages belong together — never to the scans, and they can take a while to appear.

FBI 164-81, Vault Part 65 p. 150 (DB Cooper-27401), Report, dated 13 Feb 1980 — cooper.theunsolved.net/documents/Cooper-Part-65%3A150-150

SE 164-81 PD 164-41 SLH:pkg 1

SUBS: E, J, M

---

The following investigation was conducted by SAs [REDACTED] on February 13, 1980:

AT PORTLAND, OREGON

[REDACTED], Waterways Maintenance Branch, Navigation Division, U.S. Army Engineer District, 319 S.W. Pine, telephone [REDACTED], was contacted regarding dredging operations on the Columbia River since November 24, 1971. The purpose of obtaining this information was to determine if it was possible that the bait money located on the beach property on the [REDACTED] Vancouver, Washington, on February 10, 1980, could have been placed there through dredging operations on the Columbia River.

[REDACTED], after a review of his records, advised that the only dredging operation between November 24, 1971, and the present in the vicinity of the [REDACTED] was during August 6 through September 18, 1974.

Material dredged from the river channel in the Columbia River was placed in several locations on or near the [REDACTED] as well as one location across the river on the Oregon side.

The dredge material deposited at the site where the money was located came from the north half of the ship channel, which is 300 feet wide, between river mile 96 plus 38 feet and river mile 97 plus 17 feet. This material was deposited on the beach area of the [REDACTED] between August 19 through the 25th, 1974, and consisted of 91,100 cubic yards of fill.

The channel is maintained at 40 feet in depth and all the material above 40 feet is dredged out. The dredge "Washington" of the General Construction Company did the dredging on this project. It had a 24 inch pipe with wiper bar inside the pipe. The wiper bar keeps large objects such as rocks from passing through the pipe. [REDACTED] [REDACTED] stated it would be possible for a 16x16x4 inch pack- age to get through the pipe; however, it is likely that a package that size or a human body or parts thereof would [cut off]

---

SUB E |b4-81-6299 DB Cooper-27401

Serials: PD 164-41, SE 164-81