SAC J. L. Mattson to all personnel re Vancouver special project contact instructions

Document date 23 March 1972

Part 94page 791 pageDB Cooper-42136

Open in FBI Vault (Part 94, page 79 of the PDF)
Report a problem

Email this to [email protected]

Id: Cooper-Part-94:079-079

Subject: Cooper Files: Cooper-Part-94:079-079

Document: Memo SAC J. L. Mattson to all personnel re Vancouver special project contact instructions
Id: Cooper-Part-94:079-079
Page: https://cooper.theunsolved.net/documents/Cooper-Part-94%3A079-079

What is wrong (title, date, type, which pages belong together, copies)?


What does the scan show?

Open in email app

A person reads every report. Corrections are made by hand, to the data — titles, dates, names, which pages belong together — never to the scans, and they can take a while to appear.

FBI 164-81, Vault Part 94 p. 79 (DB Cooper-42136), Memo, dated 23 Mar 1972, serial PD 164-41-900 (as read from the transcript) — cooper.theunsolved.net/documents/Cooper-Part-94%3A079-079

OPTIONAL FORM NO. 10 MAY 1962 EDITION GSA FPMR (41 CFR) 101-11.6 UNITED STATES GOVERNMENT Memorandum

---

TO : ALL HEADQUARTERS PERSONNEL DATE: 3/23/72

FROM : SAC J. L. MATTSON

SUBJECT: NORJAK

A special project is being handled by the Seattle Division in captioned matter in the Vancouver, Washington, vicinity.

Communication with the command post can be established by phone or radio. All employees should be alert to incoming calls from this source:

Phone Area Code [REDACTED] b6 b7C

Radio [REDACTED]

---

1:Headquarters Personnel 1 164-41

JLM:lam

---

164-41 -900 SEARCHED _____ INDEXED _____ SERIALIZED ____ FILED ____ MAR 28 1972 FBI — PORTLAND

---

Buy U.S. Savings Bonds Regularly on the Payroll Savings Plan DB Cooper-42136

Serials: PD 164-41, PD 164-41-900