ReportNorthwest Airlines chronological log of hijacking of Flight 305, November 24/25, 1971 (CST)24 November 1971page 7 of 7
reportLegibility: medium

Part 110, page 143

DB Cooper-435

Document date 24 November 1971

Open in FBI Vault (Part 110, page 143 of the PDF)

FBI 164-81, Vault Part 110 p. 143 (DB Cooper-435), Report, dated 24 Nov 1971 — cooper.theunsolved.net/parts/Cooper-Part-110/pages/143

Transcript

The scan is the source; the transcript is machine-generated from it.

At some point during the conference call, learned (it is not known from who) that a [REDACTED - b6/b7C] Oregon, and that he had previously been [REDACTED - b6/b7C]

---

0133 NWAFO advised conference call participants that NWA would 11:33 PM hang up if they were no longer needed on that line. Was PST asked to standby by either FAA or FBI Washington. Did so.

0135 FAA/FBI advised NWAFO that no further conference call info 11:35 PM was required of NWA at that time. Hung up. (Prior to our PST hanging up, [REDACTED] advised FAA Washington on same line that he also was "signing off".)

---

Throughout the flight from the time it was known that the hJ's desired destination was MEX, preparations were made for a landing at YUM, and Mazatlan, Mexico, as would have been necessary due to the limited range in the hJ's specified configuration. Prior to the RNO landing NWAFO suggested that crew negotiate with HJ to pull gear and flaps UP after RNO take-off, that a non-stop flight to MEX would then be possible. This, of course, proved unnecessary.

---

DB Cooper-435

---

- 141 -

---

-6-