TeletypeSAC Seattle to Director, Minneapolis and Portland re completion of Merwin Dam search17 April 1972page 2 of 4
teletypeLegibility: high

Part 24, page 477

DB Cooper-7891Serials 164-2111, MP 164-73, PD 164-41, SE 164-81, SE 164-81-8756

Document date 17 April 1972

Open in FBI Vault (Part 24, page 477 of the PDF)

FBI 164-81, Vault Part 24 p. 477 (DB Cooper-7891), Teletype, dated 17 Apr 1972 — cooper.theunsolved.net/parts/Cooper-Part-24/pages/477

Transcript

The scan is the source; the transcript is machine-generated from it.

NR004 SE PLAIN 716 PM NITEL 4/17/72 VAB TO DIRECTOR (164-2111) MINNEAPOLIS (164-73) PORTLAND (164-41) FROM SEATTLE (164-81) (-P-) IP

---

NORJAK.

SEARCH OF ENTIRE AREA IN THE VICINITY OF MERWIN DAM WAS COM- PLETED AS OF ONE PM, APRIL SEVENTEEN, SEVENTYTWO, WITH NOTHING FOUND.

ARMY UNITED WILL BE DEPARTING FROM THE AREA FOR RETURN TO FT. LEWIS, BY ELEVEN AM, APRIL EIGHTEEN NEXT. THE CP AT THE SITE WILL BE VACATED BY LATE AFTERNOON ON APRIL EIGHTEEN NEXT, BOTH BY FBI AND ARMY PERSONNEL WITH PHONE TO BE DISCONNECTED BY APRIL NINETEEN.

END

---

FBI MP MPC CLR

---

DB Cooper-7891 164-81-8756