Airtel · SAC Alexandria to SAC Boston re NORJAK lead · 20 September 1972 · 1 pageAIType, title and date: machine-written — generated by an AI model from the transcripts, and it can be wrong. The scan is the source; the transcript is machine-generated from it.
Document date 20 September 1972AIDates: machine-written — generated by an AI model from the transcripts, and it can be wrong. The scan is the source; the transcript is machine-generated from it.
The scan is the source; the transcript is machine-generated from it.
9/20/72
---
AIRTEL
TO: SAC, BOSTON (164-153)
FROM: SAC, ALEXANDRIA (164-72) (RUC)
NORJAK
(OO: SEATTLE)
Re Boston airtel to Alexandria, 8/31/72.
---
The following investigation was conducted by
SA [REDACTED] at Fort Belvoir, Virginia:
On 9/18/72, [REDACTED]
advised that [REDACTED] was assigned to his
company, [REDACTED] for 13 weeks,
undergoing the [REDACTED]
[REDACTED] stated that [REDACTED] had come to them from
Fort Devens, Mass.,
and left on 8/16/72, to return to [REDACTED]
Headquarters, Fort Devens, Mass. [REDACTED] was not
personally acquainted with [REDACTED].
---
LEADS:
BOSTON
AT FORT DEVENS, MASS. Attempt to locate [REDACTED]
[REDACTED] thru [REDACTED] Fort
Devens, Mass.