MemoTo SAC Seattle re lead on former Boeing Everett plant employee5 February 1976page 1 of 2
memoLegibility: high

Part 37, page 137

DB Cooper-14278Serials SE 164-81, SE 164-81-6845

Document date 5 February 1976

Open in FBI Vault (Part 37, page 137 of the PDF)

FBI 164-81, Vault Part 37 p. 137 (DB Cooper-14278), Memo, dated 5 Feb 1976 — cooper.theunsolved.net/parts/Cooper-Part-37/pages/137

Transcript

The scan is the source; the transcript is machine-generated from it.

OPTIONAL FORM NO. 10 JULY 1973 EDITION GSA FPMR (41 CFR) 101-11.6 UNITED STATES GOVERNMENT Memorandum

---

TO : SAC, SEATTLE (164-81) (P) DATE: 2/5/76

FROM : SA [REDACTED] b6 b7C SUBJECT: NORJAK [REDACTED] [REDACTED]

---

Re memo of SA [REDACTED] dated 12/15/75. b6 b7C On 1/19/76, [REDACTED] Boeing Plant at Everett, Washington, advised that an employment card in her files reflected that [REDACTED] was employed b6 at the Everett Boeing Plant from [REDACTED] b7C when his employment was terminated. [REDACTED] advised that [REDACTED] employment file would be located at Boeing in Seattle. She advised that her employment card did not indicate any further information.

---

LEAD:

SEATTLE DIVISION

At Seattle, Washington

If deemed appropriate, will conduct background information regarding [REDACTED] at Boeing's Seattle b6 Plant by reviewing his employment record to determine b7C current residence, etc.

---

(2) - 164-81 WRM/bjt (2)

164-81-6845 [illegible stamps and handwritten markings]

Buy U.S. Savings Bonds Regularly on the Payroll Savings Plan

5010-110 DB Cooper-14278