Part 53, page 36
DB Cooper-22374Serials SE 164-81
Document date 7 September 1972
FBI 164-81, Vault Part 53 p. 36 (DB Cooper-22374), News clipping, dated 7 Sep 1972 — cooper.theunsolved.net/parts/Cooper-Part-53/pages/36
Transcript
The scan is the source; the transcript is machine-generated from it.
FD-350 (Rev. 7-16-63) (Mount Clipping in Space Below) .Su: B
---
FBI's Search for Parachuting Skyjacker No Picnic Around PP&L's Merwin Area
PP&L's Merwin Park could have passed for a mini-military base last month when the FBI and the U.S. Army moved in to resume the search for the mysterious "D.B. Cooper" who hijacked a Northwest Airlines 727 last November, demanded $200,000 in ransom and parachuted with the money into the rainy night—most likely as the plane was over the Lake Merwin area.
The area was pinpointed by the FBI based on the position of the plane when the crew last spoke to the skyjacker over the plane's phone approximately two miles east of Woodland. Winds between 25 and 40 miles per hour were taken into account in determining that the hijacker could have drifted toward Lake Merwin.
A portion of the Company's property and surrounding area on the Lewis River in southwestern Washington was searched fol- lowing the skyjacking but the November weather hindered the operation.
Then in March, four months after the event, the FBI contacted Pacific wanting to renew the search of the rugged, wooded terrain and use Merwin Park as its head- quarters. Two weeks later 200 men, nine helicopters and the support facilities need- ed to maintain the men and machines of the squadron from Ft. Lewis moved into the Company's recreational facility to assist in the air and ground search.
The resumption of the search, although what prompted it was not made public, was coordinated with PP&L personnel. Tom Selliken, assistant vice president in charge of insurance and security, along with Larry Ouzts, loss prevention engineer; G. Eldon Drennan, vice president of engineering and power operations; Stan Piper, division pow- er superintendent; and Joe Nichols, man- ager of public affairs, met with the FBI to help determine measures that would insure the security of PP&L's hydroelectric dam and property.
Normally open to the public, the park
---
(Indicate page, name of newspaper, city and state.)
PACIFIC POWER & LIGHT COMPANY BULLETIN Portland, Oregon Vol. 55, No. 3
Date: May 1972 Edition: Author: Editor: Dolores Chenowet[h] Title: NORJAK
Character: 164-81 or Classification: Submitting Office: SEATTLE
☐ Being Investigated
---
COPY SENT TO BUREAU 164-81-[illegible] SEARCHED......... INDEXED........ SERIALIZED...[illegible].. FILED...[illegible] SEP 7 1972 FBI—SEATTLE
---
DB Cooper-22374