TeletypeNitel Seattle re completion of Merwin Dam area search with negative results17 April 19721 page
teletypeLegibility: high

Part 94, page 166

DB Cooper-42225Serials 164-2111, MP 164-73, PD 164-41, PD 164-41-959, SE 164-81

Document date 17 April 1972

Open in FBI Vault (Part 94, page 166 of the PDF)

FBI 164-81, Vault Part 94 p. 166 (DB Cooper-42225), Teletype, dated 17 Apr 1972, serial PD 164-41-959 (as read from the transcript) — cooper.theunsolved.net/parts/Cooper-Part-94/pages/166

Transcript

The scan is the source; the transcript is machine-generated from it.

NR004 SE PLAIN 310 PM NITEL 4/17/72 VAB TO DIRECTOR (164-2111) MINNEAPOLIS (164-73) PORTLAND (164-41) FROM SEATTLE (164-81) (-P-) IP

---

NORJAK.

SEARCH OF ENTIRE AREA IN THE VICINITY OF MERWIN DAM WAS COM- PLETED AS OF ONE PM, APRIL SEVENTEEN, SEVENTYTWO, WITH NOTHING FOUND.

ARMY UNITED WILL BE DEPARTING FROM THE AREA FOR RETURN TO FT. LEWIS, BY ELEVEN AM, APRIL EIGHTEEN NEXT. THE CP AT THE SITE WILL BE VACATED BY LATE AFTERNOON ON APRIL EIGHTEEN NEXT, BOTH BY FBI AND ARMY PERSONNEL WITH PHONE TO BE DISCONNECTED BY APRIL NINETEEN. END

---

SAC mattson advised 8:28pm 4/17/72, OK)

---

164-41 - 959 SEARCHED _____ INDEXED ___ SERIALIZED ___ FILED ___ . . : . 1 . 1972 FBI—PORTLAND [illegible initials/date]

---