SA Thomas J. Manning to SAC Seattle re conference with Pacific Power and Light, Portland

Document date 13 March 1972

Part 65page 3441 pageDB Cooper-27646

Open in FBI Vault (Part 65, page 344 of the PDF)
Report a problem

Email this to [email protected]

Id: Cooper-Part-65:344-344

Subject: Cooper Files: Cooper-Part-65:344-344

Document: Memo SA Thomas J. Manning to SAC Seattle re conference with Pacific Power and Light, Portland
Id: Cooper-Part-65:344-344
Page: https://cooper.theunsolved.net/documents/Cooper-Part-65%3A344-344

What is wrong (title, date, type, which pages belong together, copies)?


What does the scan show?

Open in email app

A person reads every report. Corrections are made by hand, to the data — titles, dates, names, which pages belong together — never to the scans, and they can take a while to appear.

FBI 164-81, Vault Part 65 p. 344 (DB Cooper-27646), Memo, dated 13 Mar 1972, serial SE 164-81-2536 (as read from the transcript) — cooper.theunsolved.net/documents/Cooper-Part-65%3A344-344

SAC, SEATTLE (164-81) 3/13/72

SA THOMAS J. MANNING

NORJAK

---

A conference was held with the below listed Pacific Power and Light personnel at their corporate headquarters, 920 SW 6th. Street m Portland, Oregon on 3/13/72:

---

[REDACTED - b6/b7C]

LEONDAR E. FRANK (former SA) Security Consultants Vice President

---

After discussion [REDACTED] advised that Lake Merwin Park at Ariel Dam could be used as a command post and bivouac area for Army personnel in the planned ground search. The company will power all cooking units and will further supply power to the octagonal shaped guard house which is to be used for briefing purposes. Further rest rooms will be opened for use and hot showers will be available.

While an extension phone is available at the guard house it was requested that if a phone is necessary that a separate installation be made to free the Ariel Dam switchboard of excess traffic.

Further it was requested that some type of pass be provided for authorized PP & L personnel at the dam site and from other locations having business at the site to allow free access through gate to Merwin park.

Also it was requested that a liaison officer from thesearch party handle any contacts with the public or press since PP & L personnel do not desire to become involved in answering inquiries and providing information.

---

The PP & L group also requested that a letter be directed to [REDACTED] enclosed in an inner envelope marked Official and Personal setting forth a statement insuring PP & L that no personal liability will attach to PP & L for injuries incurred by Army personnel and Agent personnel. [REDACTED] assure[d] [REDACTED] complete cooperation by PP & L in the search matter [REDACTED] that any unusual requests be cleared through him perso[nally] [guess: by] [REDACTED] 1972 All PP & L personnel were advised that SAC, Seattle woul[d] [guess: SEATTLE] letter outlining items requested within the next two days.

(2) TJM/ DB Cooper-27646

Serials: SE 164-81, SE 164-81-2536

Similar documents

Very similar text — possibly a copy redacted differently, or another memo written from the same template.