Document date 8 June 1972AIDates: machine-written — generated by an AI model from the transcripts, and it can be wrong. The scan is the source; the transcript is machine-generated from it.
FBI 164-81, Vault Part 110 p. 369 (DB Cooper-5000), Airtel, dated 8 Jun 1972, serial SE 164-81-3482 (as read from the transcript) — cooper.theunsolved.net/parts/Cooper-Part-110/pages/369
On 6/6/72, [REDACTED] located at
[REDACTED], Prescott, Oregon, advised [REDACTED] is an employee
of [REDACTED] worked for
approximately seven months at the site of
[REDACTED], Prescott, Oregon, however, [REDACTED] has since been
transferred to [REDACTED] project located
at [REDACTED] Tacoma, Washington, [REDACTED]
is unable to verify dates of [REDACTED] employment because all of
his employment records have been transferred to [REDACTED]
[REDACTED] work site. [REDACTED] was, therefore, unable to
establish if [REDACTED] was employed at [REDACTED]
[REDACTED] site at the time of the NORJAK incident.
---
LEAD
SEATTLE
AT TACOMA, WASH[INGTON]. Will contact [REDACTED]
work site, and determine if GARZA was working
at the time of the NORJAK incident in an attempt to eliminate
him as a suspect in this matter.